Throwback: Lincoln City Centre Structural Steel for Co-Op
Back in Autumn 2024, we were trusted to deliver a key steel package for Co-Op’s latest city centre site in Lincoln.
Working in a tight urban environment, our team fabricated and installed the full structural steel frame for the new building – complete with pre-cast concrete stairs and flooring.
This was a project that demanded planning, timing and pinpoint logistics – all of which we delivered with Taywel precision. From early coordination with the site team to the final fix, every detail was handled in-house.
💪 Our site team worked alongside local suppliers to keep traffic flow smooth and disruption to a minimum.
This build is another strong example of our ability to deliver major steel structures in live, busy environments.