Castle Hill Waste Compound Building
Delivering results on site for the NHS.
We worked alongside main contractor Ashcourt Construction, architects MLJ, and structural engineers GGP on this 15m x 45m portal frame build – designed for strength, simplicity and speed.
📐 Installed on a reinforced concrete raft
🔩 5 tonnes of cold rolled steel by BW Industries
⚖️ 10 tonnes of hot rolled steel
🏗 Crane lift managed by Hirds
⏱ Hot rolled frame installed in just 2 working days
A great team effort from start to finish – and another solid steel solution from Taywel.