Castle Hill Waste Compound Building

Delivering results on site for the NHS.

We worked alongside main contractor Ashcourt Construction, architects MLJ, and structural engineers GGP on this 15m x 45m portal frame build – designed for strength, simplicity and speed.

📐 Installed on a reinforced concrete raft

🔩 5 tonnes of cold rolled steel by BW Industries

⚖️ 10 tonnes of hot rolled steel

🏗 Crane lift managed by Hirds

⏱ Hot rolled frame installed in just 2 working days

A great team effort from start to finish – and another solid steel solution from Taywel.