We fabricated 38 tonnes of hot rolled and 9.5 tonnes of cold rolled steel, all destined for a high-spec steel frame.
💪 550 man-hours of welding, cutting and painting – completed in just 2.5 weeks
🔩 All connection plates cut in-house using our Esprit Plasma Cutter for exact tolerances
📐 3D IFC models were used throughout for perfect pre-site planning
And once fabrication was done, it was time to hit the road.
🚛 Day 1 on-site saw 2 full artic trucks delivered
👷♂️ A 4-man Taywel team handled the installation with 2 pickers, 1 scissor lift and a 100-tonne crane – all coordinated in seamless partnership with Hirds